Nmrv040 0.37kw Worm Gearbox for Ceramic Industry

Nmrv040 0.37kw Worm CZPT for Ceramic CZPT

RV collection Traits

  • RV – Dimensions:030-040-050-063-075-one zero five-a hundred and ten-a hundred thirty-a hundred and fifty
  • Input Choices: with input shaft, With Sq. flange,With Enter Flange
  • Enter Power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and in excess of one hundred ten in solid iron
  • Ratios between five and a hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are supplied comprehensive with artificial oil and allow for universal mounting positions, with no need to have to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and above are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, lower/higher temperature oil, filling/drain/breather/degree plug,Small gap

Simple models can be utilized to a extensive range of electrical power reduction ratios from five to 1000.
Warranty: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Range:
Variety Aged Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould company, was proven in 1965. CZPTshine specializes in the complete electricity transmission solution for high-stop gear manufacturing industries based on the goal of “Platform Item, Software Style and Professional Support”.
CZPTshine have a powerful technological force with more than 350 personnel at current, such as above 30 engineering professionals, 30 top quality inspectors, covering an location of 80000 square meters and varieties of CZPTd processing devices and screening equipments. We have a good foundation for the market software growth and service of high-finish speed reducers & variators proudly owning to the provincial engineering technology research centre,the lab of gear velocity reducers, and the foundation of present day R&D.

Our Crew

Quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

Nmrv040 0.37kw Worm CZPT for Ceramic CZPT