Nmrv050-30-71b5 Worm Geared Motor

Nmrv050-30-71b5 Worm Geared Motor

RV sequence Attributes

  • RV – Sizes:030-040-050-063-075-a hundred and five-one hundred ten-one hundred thirty-one hundred fifty
  • Enter Options: with enter shaft, With Sq. flange,With Input Flange
  • Enter Electricity .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-solid aluminium alloy budy and more than 110 in cast iron
  • Ratios amongst five and one hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are supplied complete with synthetic oil and allow for common mounting positions, with no want to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and above are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/level plug,Modest hole

Basic models can be used to a vast range of electrical power reduction ratios from 5 to 1000.
Warranty: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Selection:
Kind Old Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Electrical power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould business, was proven in 1965. CZPTshine specializes in the complete energy transmission remedy for large-conclude equipment manufacturing industries primarily based on the aim of “System Merchandise, Application Design and Skilled Services”.
CZPTshine have a robust complex force with above 350 personnel at current, like in excess of 30 engineering technicians, thirty high quality inspectors, covering an location of 80000 sq. meters and varieties of CZPTd processing machines and tests equipments. We have a great basis for the market software development and service of large-stop velocity reducers & variators owning to the provincial engineering engineering study heart,the lab of gear velocity reducers, and the foundation of modern day R&D.

Our Staff

Quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Supply

Nmrv050-30-71b5 Worm Geared Motor