Nmrv050 Worm Gearbox with Aluminum Alloy Body

Nmrv050 Worm CZPT with Aluminum Alloy Body

RV series Attributes

  • RV – Measurements:030-040-050-063-075-one zero five-a hundred and ten-a hundred thirty-a hundred and fifty
  • Enter Options: with enter shaft, With Square flange,With Enter Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-forged aluminium alloy budy and more than 110 in cast iron
  • Ratios between 5 and 100
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium units are provided complete with artificial oil and permit for universal mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and over are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, minimal/substantial temperature oil, filling/drain/breather/amount plug,Modest gap

Standard models can be used to a broad assortment of electricity reduction ratios from 5 to 1000.
Guarantee: One year from day of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Variety:
Sort Old Type Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electrical power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was set up in 1965. CZPTshine specializes in the total energy transmission solution for high-end gear producing industries based on the goal of “Platform Solution, Application Design and style and Skilled Support”.
CZPTshine have a sturdy technical force with more than 350 staff at current, including above thirty engineering specialists, thirty high quality inspectors, covering an spot of 80000 square meters and sorts of CZPTd processing equipment and testing equipments. We have a great basis for the sector software advancement and provider of higher-conclude pace reducers & variators owning to the provincial engineering technologies analysis heart,the lab of equipment velocity reducers, and the base of modern R&D.

Our Staff

Top quality Handle
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping and delivery

Nmrv050 Worm CZPT with Aluminum Alloy Body