RV sequence Traits
- RV – Dimensions:030-040-050-063-075-105-110-130-a hundred and fifty
- Input Possibilities: with enter shaft, With Square flange,With Input Flange
- Enter Energy .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-solid aluminium alloy budy and over a hundred and ten in forged iron
- Ratios in between 5 and 100
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium units are provided total with artificial oil and let for universal mounting positions, with no want to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and above are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Options: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/level plug,Tiny gap
Standard designs can be used to a broad selection of power reduction ratios from 5 to a thousand.
Guarantee: One year from date of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Velocity Selection: | ||||
Kind | Previous Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Electricity: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould company, was recognized in 1965. CZPTshine specializes in the comprehensive electricity transmission resolution for higher-finish gear production industries dependent on the intention of “Platform Product, Application Design and Specialist Support”.
CZPTshine have a strong complex force with more than 350 staff at current, like above 30 engineering technicians, thirty good quality inspectors, masking an region of 80000 sq. meters and kinds of CZPTd processing equipment and tests equipments. We have a very good foundation for the business application improvement and services of high-finish pace reducers & variators proudly owning to the provincial engineering technology research center,the lab of gear pace reducers, and the base of present day R&D.
Our Staff
Quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply