RV sequence Attributes
- RV – Measurements:030-040-050-063-075-105-one hundred ten-one hundred thirty-one hundred fifty
- Input Options: with input shaft, With Sq. flange,With Input Flange
- Input Electricity .06 to 11 kW
- RV-Dimension from 030 to 105 in die-cast aluminium alloy budy and in excess of 110 in cast iron
- Ratios amongst 5 and a hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium models are equipped complete with artificial oil and let for common mounting positions, with no want to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Size 030 and above are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/degree plug,Tiny hole
Simple models can be utilized to a broad variety of power reduction ratios from five to a thousand.
Warranty: One year from date of delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Selection: | ||||
Kind | Outdated Sort | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Electricity: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned military mould enterprise, was proven in 1965. CZPTshine specializes in the complete power transmission remedy for substantial-conclude products producing industries dependent on the intention of “System Product, Software Design and style and Specialist Support”.
CZPTshine have a robust technological drive with above 350 workers at existing, including more than thirty engineering experts, 30 high quality inspectors, masking an region of 80000 square meters and varieties of CZPTd processing machines and screening equipments. We have a great basis for the market application growth and service of high-stop pace reducers & variators possessing to the provincial engineering engineering research centre,the lab of gear speed reducers, and the base of modern day R&D.
Our Team
Top quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply