Nmrv063 Worm Gear Box for Packing Machine

Nmrv063 Worm Gear Box for Packing CZPT

RV sequence Characteristics

  • RV – Sizes:030-040-050-063-075-one zero five-one hundred ten-one hundred thirty-one hundred fifty
  • Input Options: with enter shaft, With Sq. flange,With Enter Flange
  • Input Electricity .06 to 11 kW
  • RV-Size from 030 to 105 in die-cast aluminium alloy budy and more than a hundred and ten in solid iron
  • Ratios in between five and a hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium units are provided complete with synthetic oil and let for common mounting positions, with no want to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and over are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, lower/substantial temperature oil, filling/drain/breather/level plug,Small hole

Standard types can be utilized to a broad selection of electrical power reduction ratios from 5 to one thousand.
Warranty: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Selection:
Variety Previous Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was established in 1965. CZPTshine specializes in the full energy transmission solution for substantial-end equipment producing industries based on the aim of “Platform Product, Software Design and style and Skilled Provider”.
CZPTshine have a robust technical force with above 350 employees at present, such as above 30 engineering professionals, thirty good quality inspectors, masking an spot of 80000 square meters and types of CZPTd processing equipment and screening equipments. We have a excellent basis for the market software growth and service of large-stop speed reducers & variators possessing to the provincial engineering technology investigation center,the lab of equipment speed reducers, and the foundation of present day R&D.

Our Team

Top quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping and delivery

 

Nmrv063 Worm Gear Box for Packing CZPT