Nmrv063 Worm Gearbox with Speed Variator

Nmrv063 Worm CZPT with Speed Variator

JWB Sequence Velocity Variator 
one. Functions:

 JWB-X  type

  • Measurements: ≥04
  • Power up to 1.5 kW or more
  • Situations in RAL 5571 blue solid iron
  • Shafts: circumstance hardened and tempered metal.
  • Interior components: heat-handled metal
  • Output pace with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque value max 1002Nm
  • CZPT, vibration-cost-free managing
  • Bidirectional rotation
  • Manage handwheel positionable on possibly facet
  • Slipping pace to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B variety

  • Sizes:01,02,03 and 04
  • Power up to 1.5 kW or considerably less
  • Cases in die-cast aluminium alloy
  • Shafts: situation hardened and tempered metal.
  • Inside elements: warmth-handled metal
  • Output velocity with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque price max 795 Nm
  • CZPT, vibration-free running
  • Bidirectional rotation
  • Handle hand wheel positionable on possibly side
  • Slipping pace to max load at 5%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

two. CZPT parameters

 

Variety Output Torque Output Shaft Dia.   Output Pace Range 2rpm-950rpm
SWB01 2.6-one.6N.m φ11 Applicable Motor Electrical power .18kW-seven.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Enter Alternatives With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould enterprise, was set up in 1965. CZPTshine specializes in the full electricity transmission resolution for high-stop equipment manufacturing industries based mostly on the goal of “System Item, Application Design and Professional Service”.
CZPTshine have a robust specialized drive with above 350 employees at existing, including more than 30 engineering experts, 30 quality inspectors, covering an area of 80000 sq. meters and kinds of CZPTd processing machines and tests equipments. We have a good basis for the business software development and support of substantial-finish pace reducers & variators possessing to the provincial engineering technologies research middle,the lab of gear pace reducers, and the base of contemporary R&D.

Our Team

High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

Nmrv063 Worm CZPT with Speed Variator