Nmrv075 1.5kw Worm Gearbox with Foot Mounted

Nmrv075 1.5kw Worm CZPT with Foot Mounted

RV sequence Characteristics

  • RV – Sizes:030-040-050-063-075-105-one hundred ten-130-150
  • Input Possibilities: with enter shaft, With Square flange,With Enter Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Size from 030 to 105 in die-solid aluminium alloy budy and over a hundred and ten in cast iron
  • Ratios among five and a hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are equipped full with artificial oil and allow for common mounting positions, with no need to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and in excess of are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, lower/substantial temperature oil, filling/drain/breather/degree plug,Modest hole

Standard versions can be utilized to a vast range of electricity reduction ratios from 5 to one thousand.
Warranty: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Variety:
Sort Aged Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was proven in 1965. CZPTshine specializes in the comprehensive power transmission remedy for substantial-stop gear manufacturing industries based on the intention of “Platform Solution, Software Design and Skilled Provider”.
CZPTshine have a powerful specialized drive with above 350 employees at current, such as above thirty engineering specialists, 30 top quality inspectors, masking an area of 80000 square meters and varieties of CZPTd processing machines and testing equipments. We have a great foundation for the sector application improvement and support of substantial-conclude velocity reducers & variators owning to the provincial engineering technologies research centre,the lab of gear pace reducers, and the foundation of modern day R&D.

Our Group

Quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping and delivery

 

Nmrv075 1.5kw Worm CZPT with Foot Mounted