RV collection Characteristics

  • RV – Dimensions:030-040-050-063-075-105-a hundred and ten-one hundred thirty-one hundred fifty
  • Input Options: with enter shaft, With Sq. flange,With Enter Flange
  • Input Energy .06 to 11 kW
  • RV-Size from 030 to 105 in die-forged aluminium alloy budy and in excess of 110 in solid iron
  • Ratios amongst 5 and one hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are provided complete with artificial oil and allow for common mounting positions, with no need to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and over are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, minimal/higher temperature oil, filling/drain/breather/degree plug,Small hole

Standard versions can be used to a wide variety of energy reduction ratios from 5 to a thousand.
Warranty: One year from day of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Variety:
Kind Aged Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was established in 1965. CZPTshine specializes in the total power transmission resolution for substantial-end products production industries dependent on the intention of “System Item, Application Design and Expert Support”.
CZPTshine have a robust technological drive with over 350 staff at present, including more than thirty engineering professionals, thirty top quality inspectors, masking an area of 80000 square meters and sorts of CZPTd processing devices and tests equipments. We have a good foundation for the business application improvement and services of substantial-end velocity reducers & variators owning to the provincial engineering technological innovation study centre,the lab of gear pace reducers, and the foundation of modern R&D.

Our Team

Quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Supply