Nmrv130 Worm Gearboxes with Casting Iron Body

Nmrv130 Worm CZPTes with CZPT Iron Body

RV sequence Traits

  • RV – Measurements:030-040-050-063-075-one zero five-one hundred ten-one hundred thirty-a hundred and fifty
  • Input Options: with input shaft, With Square flange,With Enter Flange
  • Enter Energy .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-forged aluminium alloy budy and over a hundred and ten in forged iron
  • Ratios amongst 5 and a hundred
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium models are equipped full with artificial oil and allow for common mounting positions, with no need to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and more than are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, low/higher temperature oil, filling/drain/breather/level plug,Modest gap

Fundamental models can be applied to a broad selection of electrical power reduction ratios from 5 to a thousand.
Warranty: One year from day of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Selection:
Variety Previous Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was proven in 1965. CZPTshine specializes in the complete energy transmission remedy for substantial-finish gear producing industries primarily based on the purpose of “Platform Item, Software Style and Specialist Support”.
CZPTshine have a powerful technical power with over 350 employees at existing, like over 30 engineering professionals, 30 quality inspectors, covering an region of 80000 sq. meters and kinds of CZPTd processing machines and testing equipments. We have a excellent foundation for the market application growth and service of large-stop pace reducers & variators possessing to the provincial engineering technologies investigation heart,the lab of equipment speed reducers, and the base of contemporary R&D.

Our Crew

Good quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Nmrv130 Worm CZPTes with CZPT Iron Body