Nrv040 0.37kw Worm Gearbox

Nrv040 0.37kw Worm CZPT

RV collection Qualities

  • RV – Sizes:030-040-050-063-075-a hundred and five-a hundred and ten-a hundred thirty-150
  • Input Options: with input shaft, With Square flange,With Enter Flange
  • Enter Power .06 to 11 kW
  • RV-Size from 030 to 105 in die-solid aluminium alloy budy and more than 110 in forged iron
  • Ratios amongst five and one hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are supplied comprehensive with synthetic oil and enable for common mounting positions, with no want to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and over are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/degree plug,Little gap

Fundamental designs can be applied to a wide selection of energy reduction ratios from 5 to a thousand.
Warranty: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Selection:
Sort Aged Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould company, was established in 1965. CZPTshine specializes in the total electricity transmission resolution for higher-conclude products manufacturing industries based on the purpose of “System Merchandise, Application Layout and Expert Services”.
CZPTshine have a sturdy complex pressure with above 350 staff at current, which includes more than 30 engineering technicians, 30 quality inspectors, covering an spot of 80000 sq. meters and kinds of CZPTd processing machines and screening equipments. We have a very good basis for the business software growth and provider of substantial-finish velocity reducers & variators proudly owning to the provincial engineering technologies study center,the lab of gear pace reducers, and the foundation of present day R&D.

Our Staff

Top quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Nrv040 0.37kw Worm CZPT