CZPTshine CZPT Cycloid Geared Motor Characteristics
one. Attributes:
1. Smooth managing,lower noise gear tooth needle more engagement.
two. Cycloidal tooth profile provides a high contact ratio to withstand overload shocks
three. Compact dimensions: single ratio CZPT from one/9 to 1/87, double phase up from 1/ninety nine to 1/7569
four. Excellent for dynamic apps: recurrent start-stop-reversing obligations satisfies for cyclo speed reducer given that inertia is low
5. Decrease maintenance fees: large reliability, lengthy daily life, small upkeep in comparison to traditional gearboxes
six. Inside areas replaceable with other makes to make certain working.
7. Grease Lubricated & Oil Lubricated Versions Offered
8. Output Shaft Rotation Direction: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Situations: Indoor Set up:10-forty Celsius, Max eighty five% Humidity, Beneath 1000m Altitude, Effectively Ventilated Setting, Cost-free of corrosive, explosive gases, vapors and dust
10.Gradual Pace Shaft Direction: Horizontal, Vertical Up & Down, CZPT Direction
11.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Relationship: Cyclo Integral Motor, Hollow Input Shaft Adapter
13. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Capacity Assortment: .37kW ~ 11kW
two. CZPT parameters
Sort | Old Sort | Output Torque | Output Shaft Dia. |
SXJ00 | JXJ00 | 98N.m | φ30 |
SXJ01 | JXJ01 | 221N.m | φ35 |
SXJ02 | JXJ02 | 448N.m | φ45 |
SXJ03 | JXJ03 | 986N.m | φ55 |
SXJ04 | JXJ04 | 1504N.m | φ70 |
SXJ05 | JXJ05 | 3051N.m | φ90 |
SXJ06 | JXJ06 | 5608N.m | φ100 |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould company, was recognized in 1965. CZPTshine specializes in the complete energy transmission remedy for higher-conclude equipment producing industries based on the aim of “Platform Item, Application Style and Skilled Services”.
CZPTshine have a sturdy technological force with more than 350 staff at current, such as in excess of thirty engineering technicians, 30 good quality inspectors, masking an location of 80000 sq. meters and kinds of CZPTd processing devices and screening equipments. We have a great basis for the sector application development and provider of higher-conclude pace reducers & variators owning to the provincial engineering technological innovation study middle,the lab of gear velocity reducers, and the foundation of present day R&D.
Our Staff
Good quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping and delivery