CZPTshine CZPT Cycloid Geared Motor Qualities
one. Functions:
one. Smooth managing,reduced sound gear tooth needle much more engagement.
2. Cycloidal tooth profile supplies a high get in touch with ratio to withstand overload shocks
three. Compact dimensions: one ratio CZPT from one/9 to 1/87, double stage up from 1/ninety nine to one/7569
four. Perfect for dynamic applications: repeated start-stop-reversing responsibilities suits for cyclo pace reducer because inertia is reduced
5. Lessen servicing fees: substantial trustworthiness, lengthy daily life, nominal maintenance in comparison to traditional gearboxes
six. Inside components replaceable with other makes to make sure working.
seven. Grease Lubricated & Oil Lubricated Versions Accessible
8. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Circumstances: Indoor Installation:10-40 Celsius, Max 85% Humidity, Beneath 1000m Altitude, Well Ventilated Setting, Free of corrosive, explosive gases, vapors and dust
ten.Slow Velocity Shaft Path: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Ability Variety: .37kW ~ 11kW
2. CZPT parameters
Sort | Previous Type | Output Torque | Output Shaft Dia. |
SXJ00 | JXJ00 | 98N.m | φ30 |
SXJ01 | JXJ01 | 221N.m | φ35 |
SXJ02 | JXJ02 | 448N.m | φ45 |
SXJ03 | JXJ03 | 986N.m | φ55 |
SXJ04 | JXJ04 | 1504N.m | φ70 |
SXJ05 | JXJ05 | 3051N.m | φ90 |
SXJ06 | JXJ06 | 5608N.m | φ100 |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned navy mould organization, was established in 1965. CZPTshine specializes in the full power transmission resolution for substantial-finish equipment production industries primarily based on the aim of “System Product, Application Design and Professional Service”.
CZPTshine have a robust technical force with over 350 personnel at current, such as in excess of thirty engineering experts, 30 quality inspectors, masking an location of 80000 square meters and kinds of CZPTd processing machines and tests equipments. We have a excellent foundation for the business application development and provider of large-end velocity reducers & variators possessing to the provincial engineering technology study middle,the lab of gear speed reducers, and the foundation of modern R&D.
Our Group
High quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping