Planetary Drive for Against Shock Cycloidal Gearbox with Foot Mounting

Planetary CZPT for Against Shock Cycloidal CZPT with Foot Mounting

CZPTshine CZPT Cycloid Geared Motor Characteristics

one. Features:
one. Smooth operating,minimal sound equipment tooth needle much more engagement.
2. Cycloidal tooth profile supplies a large get in touch with ratio to face up to overload shocks
three. Compact dimension: solitary ratio CZPT from one/9 to 1/87, double phase up from 1/99 to 1/7569 
four. Best for dynamic purposes: repeated begin-end-reversing responsibilities suits for cyclo pace reducer since inertia is minimal
5. Lessen servicing expenses: substantial reliability, long lifestyle, minimum maintenance in comparison to typical gearboxes
6. Inside elements replaceable with other brands to make sure working.

7. Grease Lubricated & Oil Lubricated Designs Offered
8. Output Shaft Rotation Path: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Problems: Indoor Installation:ten-40 Celsius, Max eighty five% Humidity, Under 1000m Altitude, Properly Ventilated Setting, Totally free of corrosive,        explosive gases, vapors and dust
10.Slow Speed Shaft Route: Horizontal, Vertical Up & Down, CZPT Path
11.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Input Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Method With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Capability Selection: .37kW ~ 11kW

2. CZPT parameters

Kind Old Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould enterprise, was established in 1965. CZPTshine specializes in the complete energy transmission resolution for high-end products producing industries based on the intention of “System Item, Software Style and Specialist Service”.
CZPTshine have a powerful complex drive with over 350 staff at present, which includes in excess of thirty engineering experts, 30 top quality inspectors, masking an spot of 80000 square meters and kinds of CZPTd processing devices and screening equipments. We have a good basis for the industry software improvement and service of large-stop pace reducers & variators possessing to the provincial engineering technology study center,the lab of equipment velocity reducers, and the foundation of present day R&D.

Our Staff

Good quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping

 

Planetary CZPT for Against Shock Cycloidal CZPT with Foot Mounting