Planetary Drive for Against Shock Cycloidal Gearbox with Motor Direct Input Types

Planetary CZPT for Against Shock Cycloidal CZPT with Motor Direct Input Types

CZPTshine CZPT Cycloid Geared Motor Qualities

1. Functions:
one. Smooth operating,minimal sounds gear tooth needle far more engagement.
2. Cycloidal tooth profile gives a higher get in touch with ratio to withstand overload shocks
three. Compact dimension: solitary ratio CZPT from 1/9 to one/87, double stage up from 1/99 to one/7569 
4. Ideal for dynamic applications: repeated begin-stop-reversing obligations fits for cyclo speed reducer given that inertia is low
5. Minimize maintenance expenses: substantial reliability, lengthy lifestyle, small servicing in contrast to conventional gearboxes
six. Interior elements replaceable with other makes to make certain working.

7. Grease Lubricated & Oil Lubricated Types Obtainable
eight. Output Shaft Rotation Direction: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Conditions: Indoor Set up:ten-forty Celsius, Max 85% Humidity, Underneath 1000m Altitude, Effectively Ventilated Environment, Free of corrosive,        explosive gases, vapors and dust
ten.Gradual Pace Shaft Path: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capability Assortment: .37kW ~ 11kW

two. CZPT parameters

Kind Aged Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould business, was set up in 1965. CZPTshine specializes in the total electricity transmission solution for higher-stop gear producing industries based mostly on the intention of “System Solution, Software Layout and Expert Services”.
CZPTshine have a robust specialized power with in excess of 350 staff at current, including in excess of thirty engineering professionals, 30 good quality inspectors, covering an area of 80000 square meters and sorts of CZPTd processing equipment and screening equipments. We have a excellent basis for the market software growth and service of large-conclude pace reducers & variators proudly owning to the provincial engineering engineering analysis middle,the lab of equipment velocity reducers, and the base of contemporary R&D.

Our Group

Top quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping

 

Planetary CZPT for Against Shock Cycloidal CZPT with Motor Direct Input Types