Power Transmission Worm Gearboxes From China

Power Transmission Worm CZPTes From China

RV collection Qualities

  • RV – Measurements:030-040-050-063-075-one hundred and five-one hundred ten-130-one hundred fifty
  • Input Options: with enter shaft, With Sq. flange,With Enter Flange
  • Input Electricity .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-solid aluminium alloy budy and above 110 in cast iron
  • Ratios amongst five and 100
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are equipped full with artificial oil and enable for common mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and in excess of are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Alternatives: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/level plug,Little gap

Basic versions can be used to a broad variety of power reduction ratios from five to a thousand.
Warranty: One year from date of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Variety:
Sort Old Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was set up in 1965. CZPTshine specializes in the comprehensive electrical power transmission answer for high-finish gear producing industries primarily based on the purpose of “System Solution, Application Style and Specialist Provider”.
CZPTshine have a powerful technical power with over 350 workers at existing, like in excess of 30 engineering specialists, thirty quality inspectors, covering an location of 80000 sq. meters and types of CZPTd processing equipment and tests equipments. We have a great basis for the industry software advancement and service of large-stop velocity reducers & variators possessing to the provincial engineering technological innovation investigation middle,the lab of gear speed reducers, and the foundation of modern day R&D.

Our Crew

Top quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

Power Transmission Worm CZPTes From China