Power Transmission Worm Reductor Small 90 Degree Gearbox

Power Transmission Worm Reductor Small 90 Degree CZPT

RV collection Qualities

  • RV – Sizes:030-040-050-063-075-one hundred and five-a hundred and ten-a hundred thirty-a hundred and fifty
  • Enter Possibilities: with input shaft, With Sq. flange,With Enter Flange
  • Input Electricity .06 to 11 kW
  • RV-Size from 030 to 105 in die-cast aluminium alloy budy and above a hundred and ten in cast iron
  • Ratios among 5 and 100
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are equipped total with artificial oil and let for common mounting positions, with no require to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and in excess of are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, reduced/substantial temperature oil, filling/drain/breather/stage plug,Small hole

Standard models can be applied to a wide range of electricity reduction ratios from 5 to one thousand.
Warranty: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Range:
Variety Previous Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the complete electrical power transmission solution for large-conclude equipment production industries based mostly on the aim of “System Item, Software Design and Specialist Provider”.
CZPTshine have a sturdy technical power with above 350 staff at current, such as over thirty engineering experts, thirty good quality inspectors, covering an spot of 80000 square meters and sorts of CZPTd processing equipment and tests equipments. We have a very good foundation for the industry software improvement and support of substantial-stop velocity reducers & variators owning to the provincial engineering technology analysis middle,the lab of equipment speed reducers, and the foundation of contemporary R&D.

Our Crew

High quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Power Transmission Worm Reductor Small 90 Degree CZPT