RV Series Aluminium Alloy Worm Gearbox

RV Series Aluminium Alloy Worm CZPT

RV sequence Qualities

  • RV – Sizes:030-040-050-063-075-a hundred and five-one hundred ten-one hundred thirty-a hundred and fifty
  • Input Options: with enter shaft, With Sq. flange,With Input Flange
  • Input Electrical power .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and over a hundred and ten in forged iron
  • Ratios in between 5 and 100
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are supplied comprehensive with artificial oil and let for universal mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Alternatives: torque arm, output flange, viton oil seals, low/higher temperature oil, filling/drain/breather/amount plug,Modest gap

Basic types can be used to a broad selection of power reduction ratios from 5 to a thousand.
Guarantee: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Variety:
Variety Previous Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould enterprise, was recognized in 1965. CZPTshine specializes in the total power transmission resolution for higher-finish gear manufacturing industries primarily based on the purpose of “System Product, Software Design and Specialist Services”.
CZPTshine have a robust specialized pressure with in excess of 350 workers at present, like more than thirty engineering experts, thirty high quality inspectors, covering an location of 80000 square meters and sorts of CZPTd processing equipment and screening equipments. We have a great foundation for the business application improvement and service of large-stop pace reducers & variators proudly owning to the provincial engineering technology investigation center,the lab of equipment velocity reducers, and the base of modern day R&D.

Our Group

Top quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

RV Series Aluminium Alloy Worm CZPT