RV series Characteristics
- RV – Sizes:030-040-050-063-075-a hundred and five-a hundred and ten-one hundred thirty-one hundred fifty
- Enter Possibilities: with enter shaft, With Square flange,With Enter Flange
- Input Electricity .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-solid aluminium alloy budy and in excess of 110 in solid iron
- Ratios amongst five and a hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium units are supplied comprehensive with synthetic oil and permit for common mounting positions, with no want to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and more than are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Choices: torque arm, output flange, viton oil seals, lower/substantial temperature oil, filling/drain/breather/degree plug,Small gap
Standard models can be utilized to a vast assortment of energy reduction ratios from five to one thousand.
Guarantee: One year from date of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Selection: | ||||
Variety | Old Sort | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Electrical power: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned military mould company, was set up in 1965. CZPTshine specializes in the full energy transmission resolution for substantial-end gear production industries dependent on the goal of “Platform Product, Software Design and Expert Service”.
CZPTshine have a strong complex force with in excess of 350 employees at existing, like above 30 engineering professionals, 30 quality inspectors, covering an spot of 80000 sq. meters and types of CZPTd processing machines and testing equipments. We have a great foundation for the sector software improvement and service of large-stop pace reducers & variators owning to the provincial engineering technologies research heart,the lab of equipment velocity reducers, and the base of contemporary R&D.
Our Crew
Top quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping