RV Series Worm Gear Box

RV Series Worm Gear Box

RV sequence Traits

  • RV – Measurements:030-040-050-063-075-a hundred and five-a hundred and ten-one hundred thirty-150
  • Input Choices: with enter shaft, With Sq. flange,With Enter Flange
  • Input Power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-solid aluminium alloy budy and above 110 in forged iron
  • Ratios between 5 and a hundred
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium models are supplied comprehensive with artificial oil and enable for common mounting positions, with no need to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and in excess of are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/amount plug,Modest hole

Standard designs can be used to a extensive assortment of energy reduction ratios from 5 to 1000.
Guarantee: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Variety:
Sort Previous Variety Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electrical power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould enterprise, was established in 1965. CZPTshine specializes in the comprehensive electrical power transmission resolution for large-stop products manufacturing industries dependent on the goal of “Platform Merchandise, Software Design and style and Skilled Support”.
CZPTshine have a powerful complex power with in excess of 350 employees at existing, which includes over 30 engineering technicians, 30 good quality inspectors, masking an region of 80000 square meters and kinds of CZPTd processing equipment and testing equipments. We have a great basis for the business software improvement and service of substantial-conclude pace reducers & variators proudly owning to the provincial engineering engineering analysis centre,the lab of equipment velocity reducers, and the foundation of modern R&D.

Our Crew

Top quality Management
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

RV Series Worm Gear Box