RV Series Worm Gear Drives Reducer Motor Gearbox

RV Series Worm Gear CZPTs Reducer Motor CZPT

RV collection Characteristics

  • RV – Measurements:030-040-050-063-075-one zero five-110-130-150
  • Input Alternatives: with input shaft, With Square flange,With Enter Flange
  • Enter Power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and above one hundred ten in solid iron
  • Ratios in between five and 100
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are supplied full with artificial oil and let for universal mounting positions, with no want to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and more than are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/amount plug,Little hole

Fundamental models can be used to a vast range of electricity reduction ratios from five to 1000.
Guarantee: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Variety:
Type Outdated Variety Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould business, was set up in 1965. CZPTshine specializes in the total energy transmission answer for substantial-conclude products production industries based on the intention of “Platform Item, Application Design and style and Expert Services”.
CZPTshine have a strong technical power with over 350 staff at current, which includes more than thirty engineering professionals, 30 quality inspectors, masking an location of 80000 square meters and kinds of CZPTd processing equipment and screening equipments. We have a good basis for the industry software development and provider of large-stop speed reducers & variators owning to the provincial engineering technologies analysis centre,the lab of gear speed reducers, and the foundation of modern R&D.

Our Team

Top quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping and delivery

RV Series Worm Gear CZPTs Reducer Motor CZPT