RV Series Worm Gearboxes for Power Transmission

RV Series Worm CZPTes for Power Transmission

RV sequence Traits

  • RV – Measurements:030-040-050-063-075-a hundred and five-110-one hundred thirty-a hundred and fifty
  • Input Options: with input shaft, With Square flange,With Enter Flange
  • Enter Energy .06 to 11 kW
  • RV-Size from 030 to 105 in die-forged aluminium alloy budy and in excess of 110 in solid iron
  • Ratios among five and a hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium units are supplied total with synthetic oil and allow for universal mounting positions, with no want to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and in excess of are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/degree plug,Little gap

Standard models can be used to a wide range of power reduction ratios from 5 to one thousand.
Guarantee: One year from date of supply.

 

WORM GEARBOX          
SNW SERIES          Output Speed Selection:
Type Old Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was established in 1965. CZPTshine specializes in the complete power transmission resolution for higher-end products manufacturing industries based on the intention of “Platform Solution, Software Style and Professional Service”.
CZPTshine have a robust specialized drive with above 350 workers at current, which includes in excess of thirty engineering specialists, 30 good quality inspectors, covering an region of 80000 sq. meters and types of CZPTd processing devices and tests equipments. We have a great basis for the industry application development and services of large-end velocity reducers & variators possessing to the provincial engineering engineering investigation center,the lab of gear speed reducers, and the foundation of present day R&D.

Our Group

Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

RV Series Worm CZPTes for Power Transmission