RV series Traits
- RV – Dimensions:030-040-050-063-075-105-110-130-150
- Enter Choices: with enter shaft, With Sq. flange,With Enter Flange
- Input Power .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and more than one hundred ten in forged iron
- Ratios amongst 5 and a hundred
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium units are provided comprehensive with artificial oil and allow for universal mounting positions, with no want to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and over are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Options: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/level plug,Small gap
Simple designs can be applied to a extensive variety of electricity reduction ratios from five to 1000.
Guarantee: One year from date of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Selection: | ||||
Kind | Previous Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Energy: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould enterprise, was set up in 1965. CZPTshine specializes in the full electrical power transmission resolution for high-end equipment production industries based on the intention of “System Product, Application Design and style and Skilled Support”.
CZPTshine have a strong technical pressure with in excess of 350 personnel at present, which includes above 30 engineering professionals, thirty good quality inspectors, masking an region of 80000 square meters and types of CZPTd processing machines and screening equipments. We have a great foundation for the business software improvement and service of substantial-finish speed reducers & variators possessing to the provincial engineering technological innovation study centre,the lab of equipment speed reducers, and the base of modern R&D.
Our Crew
High quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping