RV collection Traits
- RV – Measurements:030-040-050-063-075-one zero five-a hundred and ten-one hundred thirty-one hundred fifty
- Input Alternatives: with enter shaft, With Sq. flange,With Input Flange
- Input Electrical power .06 to 11 kW
- RV-Size from 030 to 105 in die-forged aluminium alloy budy and more than 110 in forged iron
- Ratios amongst 5 and 100
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium units are supplied full with artificial oil and enable for universal mounting positions, with no want to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and above are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Options: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/amount plug,Little gap
Fundamental models can be utilized to a extensive selection of electrical power reduction ratios from 5 to a thousand.
Guarantee: One year from date of shipping.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Assortment: | ||||
Variety | Aged Type | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Energy: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould organization, was established in 1965. CZPTshine specializes in the total electrical power transmission resolution for large-end equipment manufacturing industries based mostly on the intention of “System Merchandise, Software Design and style and Skilled Provider”.
CZPTshine have a powerful complex force with over 350 workers at present, like over 30 engineering experts, 30 quality inspectors, covering an location of 80000 sq. meters and types of CZPTd processing machines and tests equipments. We have a excellent basis for the industry software development and services of high-finish pace reducers & variators possessing to the provincial engineering technology analysis middle,the lab of gear velocity reducers, and the base of contemporary R&D.
Our Team
Good quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply