S collection CZPTcal Geared Motor Traits
1. Functions:
- Substantial effectiveness: 75%-eighty%
- Substantial technology: the helical equipment and a worm equipment merged with an integrated transmission to increase the torque and effectiveness.
- Large precision: the gear is created of higher-quality alloy steel forging, carbonitriding and hardening treatment, grinding approach to make certain large precision and stable operating.
- High interchangeability: highly modular, serial layout, strong flexibility and interchangeability.
two. CZPT parameters
Ratio | 6.8-288 |
Input electrical power | .12-22KW |
Output torque | 11-4530N.m |
Output speed | 5-206rpm |
Mounting kind | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Method | Flange input(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor |
Brake Release | HF-handbook release(lock in the brake launch situation), HR-guide launch(autom-atic braking place) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Variety | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing materials | HT200 substantial-strength cast iron from R37,47,fifty seven,sixty seven,77,87 |
Housing substance | HT250 High toughness forged iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
Single Stage Efficiency | seventy five%-80% |
Lubricant | VG220 |
Safety Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was set up in 1965. CZPTshine specializes in the complete energy transmission answer for large-finish equipment production industries dependent on the purpose of “Platform Item, Application Design and style and Professional Services”.
CZPTshine have a strong technical pressure with above 350 employees at current, like above thirty engineering specialists, 30 quality inspectors, masking an region of 80000 square meters and kinds of CZPTd processing machines and screening equipments. We have a very good foundation for the market software improvement and support of large-finish speed reducers & variators owning to the provincial engineering technologies investigation middle,the lab of equipment speed reducers, and the base of contemporary R&D.
Our Crew
High quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery