S Series Helical Worm Geared Motor with 380V

S Series Helical Worm Geared Motor with 380V

S collection CZPTcal Geared Motor Characteristics

1. Functions:

  1. Higher effectiveness: seventy five%-80%
  2. Higher technological innovation: the helical equipment and a worm gear blended with an built-in transmission to enhance the torque and efficiency.
  3. Substantial precision: the equipment is made of higher-top quality alloy steel forging, carbonitriding and hardening treatment, grinding procedure to ensure higher precision and stable working.
  4. Large interchangeability: hugely modular, serial layout, sturdy versatility and interchangeability.

two. CZPT parameters
 

Ratio six.8-288
Enter power .12-22KW
Output torque 11-4530N.m
Output velocity 5-206rpm
Mounting variety Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Technique Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor
Brake Launch HF-guide release(lock in the brake release place), HR-handbook release(autom-atic braking situation)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Variety S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing material HT200 high-energy solid iron from R37,forty seven,fifty seven,sixty seven,seventy seven,87
Housing content HT250 Large strength cast iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening remedy
Single Stage Performance seventy five%-80%
Lubricant VG220
Security Class IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould enterprise, was recognized in 1965. CZPTshine specializes in the comprehensive electricity transmission answer for large-finish gear manufacturing industries primarily based on the aim of “System Item, Software Layout and Specialist Support”.
CZPTshine have a sturdy complex pressure with above 350 workers at existing, like more than 30 engineering professionals, thirty quality inspectors, covering an location of 80000 sq. meters and types of CZPTd processing machines and testing equipments. We have a good foundation for the industry application development and services of substantial-end speed reducers & variators owning to the provincial engineering technologies study center,the lab of gear pace reducers, and the base of present day R&D.

Our Staff

High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping

 

S Series Helical Worm Geared Motor with 380V