S Series Right Angle Helical Worm Gearbox

S Series Right Angle Helical Worm CZPT

S collection CZPTcal Geared Motor Traits

one. Functions:

  1. High performance: seventy five%-80%
  2. Higher technology: the helical equipment and a worm gear merged with an integrated transmission to increase the torque and efficiency.
  3. Large precision: the equipment is produced of large-high quality alloy metal forging, carbonitriding and hardening remedy, grinding procedure to guarantee substantial precision and steady managing.
  4. High interchangeability: hugely modular, serial design and style, powerful versatility and interchangeability.

two. CZPT parameters
 

Ratio 6.8-288
Enter power .12-22KW
Output torque eleven-4530N.m
Output pace 5-206rpm
Mounting kind Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Method Flange input(AM), shaft input(Ad), inline AC motor input, or AQA servo motor
Brake Release HF-guide launch(lock in the brake launch placement), HR-manual release(autom-atic braking situation)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Sort S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing content HT200 higher-energy solid iron from R37,47,57,67,77,87
Housing materials HT250 Substantial power forged iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment method
Single Phase Efficiency 75%-80%
Lubricant VG220
Safety Course IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was proven in 1965. CZPTshine specializes in the full energy transmission answer for large-conclude products producing industries based on the intention of “System Item, Application Design and Skilled Support”.
CZPTshine have a strong technological power with in excess of 350 workers at present, like in excess of 30 engineering professionals, 30 good quality inspectors, covering an region of 80000 square meters and kinds of CZPTd processing equipment and screening equipments. We have a good foundation for the market application improvement and provider of large-conclude pace reducers & variators proudly owning to the provincial engineering technological innovation analysis centre,the lab of gear velocity reducers, and the foundation of contemporary R&D.

Our Staff

Top quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping

 

S Series Right Angle Helical Worm CZPT