S sequence CZPTcal Geared Motor Characteristics
one. Features:
- Higher efficiency: seventy five%-eighty%
- Large technological innovation: the helical equipment and a worm gear merged with an built-in transmission to increase the torque and performance.
- High precision: the equipment is produced of high-good quality alloy steel forging, carbonitriding and hardening therapy, grinding process to make certain higher precision and secure managing.
- Higher interchangeability: hugely modular, serial layout, powerful versatility and interchangeability.
two. CZPT parameters
Ratio | six.eight-288 |
Input energy | .twelve-22KW |
Output torque | 11-4530N.m |
Output velocity | five-206rpm |
Mounting type | Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Technique | Flange enter(AM), shaft input(Ad), inline AC motor input, or AQA servo motor |
Brake Release | HF-handbook release(lock in the brake release position), HR-manual release(autom-atic braking placement) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Type | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing substance | HT200 large-energy cast iron from R37,47,fifty seven,67,seventy seven,87 |
Housing material | HT250 High strength cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening therapy |
One Stage Efficiency | 75%-80% |
Lubricant | VG220 |
Security Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the full electrical power transmission solution for large-finish equipment production industries based mostly on the aim of “Platform Merchandise, Software Style and Professional Provider”.
CZPTshine have a robust technological pressure with above 350 workers at current, which includes over 30 engineering technicians, thirty top quality inspectors, masking an spot of 80000 square meters and kinds of CZPTd processing machines and testing equipments. We have a great foundation for the business application improvement and provider of substantial-conclude velocity reducers & variators owning to the provincial engineering technological innovation research center,the lab of equipment velocity reducers, and the foundation of contemporary R&D.
Our Group
Top quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
Packing
Supply