S sequence CZPTcal Geared Motor Characteristics
1. Features:
- Large effectiveness: 75%-eighty%
- Higher engineering: the helical gear and a worm gear merged with an built-in transmission to increase the torque and performance.
- Substantial precision: the equipment is manufactured of large-top quality alloy steel forging, carbonitriding and hardening remedy, grinding procedure to make sure substantial precision and secure running.
- Higher interchangeability: very modular, serial design, powerful flexibility and interchangeability.
two. CZPT parameters
Ratio | six.eight-288 |
Input electricity | .twelve-22KW |
Output torque | 11-4530N.m |
Output pace | five-206rpm |
Mounting sort | Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Approach | Flange enter(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-guide launch(lock in the brake launch situation), HR-manual release(autom-atic braking position) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Kind | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing content | HT200 substantial-energy forged iron from R37,47,fifty seven,67,seventy seven,87 |
Housing materials | HT250 Higher power cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment |
One Phase Performance | seventy five%-eighty% |
Lubricant | VG220 |
Safety Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould enterprise, was set up in 1965. CZPTshine specializes in the total electrical power transmission answer for large-end products producing industries based on the aim of “System Solution, Application Design and style and Specialist Support”.
CZPTshine have a powerful technological power with over 350 employees at present, which includes over thirty engineering technicians, thirty quality inspectors, masking an area of 80000 sq. meters and types of CZPTd processing machines and testing equipments. We have a excellent foundation for the business application development and support of higher-stop speed reducers & variators possessing to the provincial engineering technology study center,the lab of equipment velocity reducers, and the foundation of modern day R&D.
Our Group
Top quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery