Small Worm Belt Conveyor Gear Box

Small Worm Belt Conveyor Gear Box

RV collection Traits

  • RV – Sizes:030-040-050-063-075-one hundred and five-110-130-a hundred and fifty
  • Enter Choices: with input shaft, With Square flange,With Enter Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and more than a hundred and ten in forged iron
  • Ratios in between five and one hundred
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium models are provided complete with synthetic oil and let for universal mounting positions, with no need to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and in excess of are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/amount plug,Tiny hole

Fundamental designs can be used to a vast range of energy reduction ratios from 5 to a thousand.
Guarantee: One year from day of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Pace Assortment:
Variety Old Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electrical power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was set up in 1965. CZPTshine specializes in the comprehensive energy transmission resolution for substantial-finish products production industries based mostly on the aim of “Platform Item, Software Layout and Specialist Provider”.
CZPTshine have a powerful technical power with in excess of 350 personnel at current, like more than thirty engineering specialists, thirty quality inspectors, masking an spot of 80000 square meters and varieties of CZPTd processing machines and screening equipments. We have a good foundation for the industry application advancement and service of large-end velocity reducers & variators owning to the provincial engineering technological innovation analysis heart,the lab of equipment speed reducers, and the base of present day R&D.

Our Staff

Top quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Small Worm Belt Conveyor Gear Box