Snkg Series Helical Geared Box

Snkg Series Helical Geared Box

Bevel helical gearbox with Long lasting magnet synchronous motor combine variable frequency driver for conveyor

SNKG Sequence prorduct undertake harden tooth surface bevel equipment and helical equipment to push, subsequent the design and style theory of modularization , FEA analyse technologies, special lower-sound equipment tooth profile, with the traits of compact quantity, high load efficiency and steady working, dependability and extended support daily life.

Key Advantages
-Simple wiring, low expense
-Big sum of data, quick velocity, 100m, information transmission is 500K
-All control units have the very same condition, it means each and every node has the identical rights to occupy the bus (ship and acquire)
-Interaction rate satisfies manage needs, interaction data quantity supports needed information studying.
-CZPT eye and proximity swap sensor provide sign to the driver right, it is practical and trustworthy.

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd(CZPTshine) have a powerful specialized pressure with over 350 personnel at current, like in excess of thirty engineering technicians, 30 top quality inspectors, masking an spot of 80000 square meters and sorts of CZPTd processing equipment and tests equipments. We have a very good foundation for the market software improvement and provider of large-end pace reducers & variators proudly owning to the provincial engineering engineering research heart,the lab of equipment pace reducers, and the foundation of modern R&D.

Our Staff

Top quality Management
High quality:Insist on Advancement,Strive for Excellence With the advancement of equipment manufacturing indurstry,consumer by no means satirsfy with the current high quality of our items,on the opposite,wcreate the worth of good quality.
Top quality coverage:to boost the overall stage in the area of energy transmission  
Top quality Look at:Ongoing Advancement , pursuit of excellence
High quality Philosophy:Good quality results in price

three. Incoming Good quality Management
To establish the AQL acceptable level of incoming content control, to offer the material for the complete inspection, sampling, immunity. On the acceptance of certified products to warehousing, substandard goods to take return, check out, rework, rework inspection accountable for tracking undesirable, to keep an eye on the supplier to consider corrective measures to prevent recurrence.

four. Approach Good quality Management
The production site of the first assessment, inspection and closing inspection, sampling according to the needs of some assignments, judging the quality change trend discovered irregular phenomenon of production, and supervise the generation office to boost, eliminate the abnormal phenomenon or point out.

5. FQC(Closing QC)
Right after the production office will comprehensive the product, stand in the customer’s position on the completed merchandise good quality verification, in purchase to make certain the quality of buyer anticipations and needs.

6. OQC(Outgoing QC)
Right after the product sample inspection to figure out the certified, allowing storage, but when the concluded solution from the warehouse before the official supply of the goods, there is a verify, this is referred to as the shipment inspection.Examine content:In the warehouse storage and transfer position to validate, whilst confirming the shipping of the merchandise is a item inspection to figure out the certified items.

Packing

Shipping

Snkg Series Helical Geared Box