JWB Collection Pace Variator
one. Characteristics:
JWB-X type
- Sizes: ≥04
- Power up to 1.5 kW or far more
- Cases in RAL 5571 blue cast iron
- Shafts: situation hardened and tempered steel.
- Internal elements: warmth-taken care of steel
- Output pace with 4 pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque worth max 1002Nm
- CZPT, vibration-cost-free operating
- Bidirectional rotation
- Management handwheel positionable on either facet
- Slipping velocity to max load at five%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
JWB-X B type
- Sizes:01,02,03 and 04
- Electrical power up to 1.5 kW or significantly less
- Circumstances in die-solid aluminium alloy
- Shafts: situation hardened and tempered steel.
- Internal components: heat-taken care of metal
- Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, 8-40r/min, nine-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque benefit max 795 Nm
- CZPT, vibration-free of charge working
- Bidirectional rotation
- Control hand wheel positionable on possibly facet
- Slipping pace to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
2. CZPT parameters
Sort | Output Torque | Output Shaft Dia. | Output Speed Assortment | 2rpm-950rpm | |
SWB01 | 2.six-1.6N.m | φ11 | Relevant Motor Energy | .18kW-seven.5kW | |
SWB02 | 258-1.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Input Choices | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Input Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Enter Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was established in 1965. CZPTshine specializes in the total electricity transmission remedy for high-conclude products manufacturing industries based on the aim of “System Item, Software Style and Expert Provider”.
CZPTshine have a strong technical force with in excess of 350 personnel at current, such as over thirty engineering professionals, thirty quality inspectors, covering an spot of 80000 square meters and types of CZPTd processing equipment and testing equipments. We have a excellent foundation for the industry application improvement and provider of higher-end speed reducers & variators owning to the provincial engineering technology research middle,the lab of gear pace reducers, and the foundation of modern R&D.
Our Team
High quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
7. Certification.
Packing
Delivery