Starshine Cycloid Foot Mounted Reduction Gearbox Without Motor

CZPT Cycloid Foot Mounted Reduction CZPT Without Motor

CZPTshine CZPT Cycloid Geared Motor Characteristics

1. Attributes:
1. Smooth working,reduced sound equipment tooth needle far more engagement.
2. Cycloidal tooth profile offers a higher make contact with ratio to withstand overload shocks
three. Compact dimensions: solitary ratio CZPT from one/9 to one/87, double phase up from 1/ninety nine to 1/7569 
four. Ideal for dynamic applications: frequent start off-end-reversing duties suits for cyclo pace reducer since inertia is low
five. Decrease maintenance fees: large dependability, prolonged life, small upkeep in contrast to standard gearboxes
six. Inner elements replaceable with other brands to make certain running.

seven. Grease Lubricated & Oil Lubricated Types Offered
8. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Set up:10-forty Celsius, Max eighty five% Humidity, Underneath 1000m Altitude, Effectively Ventilated Environment, Totally free of corrosive,        explosive gases, vapors and dust
ten.Slow Pace Shaft Course: Horizontal, Vertical Up & Down, CZPT Path
eleven.Mounting Style: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Selection: .37kW ~ 11kW

2. CZPT parameters

Kind Aged Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was set up in 1965. CZPTshine specializes in the comprehensive power transmission answer for higher-conclude equipment production industries based mostly on the aim of “System Merchandise, Application Design and Expert Support”.
CZPTshine have a powerful technological power with above 350 workers at present, such as over 30 engineering experts, 30 good quality inspectors, covering an area of 80000 sq. meters and types of CZPTd processing equipment and tests equipments. We have a excellent basis for the market software growth and provider of high-end velocity reducers & variators possessing to the provincial engineering technologies analysis heart,the lab of equipment velocity reducers, and the foundation of modern R&D.

Our Staff

Good quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

 

CZPT Cycloid Foot Mounted Reduction CZPT Without Motor