JWB Series Velocity Variator
one. Attributes:
JWB-X type
- Measurements: ≥04
- Power up to 1.5 kW or a lot more
- Situations in RAL 5571 blue cast iron
- Shafts: situation hardened and tempered metal.
- Interior elements: warmth-dealt with metal
- Output speed with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque value max 1002Nm
- CZPT, vibration-cost-free managing
- Bidirectional rotation
- Management handwheel positionable on both facet
- Slipping pace to max load at five%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
JWB-X B variety
- Sizes:01,02,03 and 04
- Electrical power up to 1.5 kW or considerably less
- Circumstances in die-cast aluminium alloy
- Shafts: situation hardened and tempered steel.
- Inside parts: warmth-treated metal
- Output speed with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque price max 795 Nm
- CZPT, vibration-cost-free operating
- Bidirectional rotation
- Control hand wheel positionable on either facet
- Slipping velocity to max load at 5%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
2. CZPT parameters
Type | Output Torque | Output Shaft Dia. | Output Speed Range | 2rpm-950rpm | |
SWB01 | two.6-one.6N.m | φ11 | Applicable Motor Electricity | .18kW-seven.5kW | |
SWB02 | 258-one.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Choices | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Enter Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was recognized in 1965. CZPTshine specializes in the full energy transmission solution for high-stop gear manufacturing industries dependent on the intention of “Platform Product, Software Style and Expert Support”.
CZPTshine have a strong complex drive with more than 350 employees at current, which includes above thirty engineering professionals, thirty good quality inspectors, masking an region of 80000 sq. meters and kinds of CZPTd processing equipment and testing equipments. We have a great basis for the market application advancement and support of higher-finish velocity reducers & variators proudly owning to the provincial engineering technological innovation analysis middle,the lab of equipment pace reducers, and the base of present day R&D.
Our Team
Top quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping and delivery