Stepless Variable Speed Changing Gearbox

Stepless Variable Speed Changing CZPT

JWB Collection Pace Variator 
1. Characteristics:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or more
  • Instances in RAL 5571 blue solid iron
  • Shafts: scenario hardened and tempered metal.
  • Inside components: heat-dealt with steel
  • Output pace with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque value max 1002Nm
  • CZPT, vibration-free managing
  • Bidirectional rotation
  • Control handwheel positionable on possibly facet
  • Slipping speed to max load at five% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B kind

  • Measurements:01,02,03 and 04
  • Power up to 1.5 kW or much less
  • Cases in die-cast aluminium alloy
  • Shafts: circumstance hardened and tempered metal.
  • Inside components: warmth-dealt with steel
  • Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque price max 795 Nm
  • CZPT, vibration-totally free running
  • Bidirectional rotation
  • Management hand wheel positionable on either facet
  • Slipping velocity to max load at five%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Speed Variety 2rpm-950rpm
SWB01 two.6-1.6N.m φ11 Relevant Motor Electrical power .18kW-7.5kW
SWB02 258-1.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Enter Options With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned navy mould business, was set up in 1965. CZPTshine specializes in the complete energy transmission solution for large-conclude gear manufacturing industries primarily based on the aim of “System Merchandise, Application Design and Skilled Support”.
CZPTshine have a robust complex power with in excess of 350 employees at current, which includes more than 30 engineering technicians, 30 quality inspectors, covering an location of 80000 square meters and types of CZPTd processing devices and screening equipments. We have a excellent foundation for the business software improvement and services of substantial-conclude speed reducers & variators owning to the provincial engineering technological innovation analysis heart,the lab of equipment speed reducers, and the foundation of modern day R&D.

Our Crew

High quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

Stepless Variable Speed Changing CZPT