Suit Impact and Loading Situations Cycloidal Gearbox with Flange Input Types

Suit Impact and Loading Situations Cycloidal CZPT with Flange Input Types

CZPTshine CZPT Cycloid Geared Motor Qualities

1. Attributes:
1. Smooth operating,low noise equipment tooth needle more engagement.
2. Cycloidal tooth profile gives a large contact ratio to withstand overload shocks
3. Compact size: single ratio CZPT from 1/9 to one/87, double phase up from 1/99 to 1/7569 
four. Excellent for dynamic purposes: repeated commence-cease-reversing duties satisfies for cyclo speed reducer considering that inertia is low
five. Minimize routine maintenance costs: higher reliability, lengthy life, small maintenance compared to conventional gearboxes
six. Interior areas replaceable with other brands to ensure running.

7. Grease Lubricated & Oil Lubricated Types Obtainable
8. Output Shaft Rotation Path: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Set up:10-forty Celsius, Max 85% Humidity, Underneath 1000m Altitude, Well Ventilated Atmosphere, Free of charge of corrosive,        explosive gases, vapors and dust
10.Sluggish Pace Shaft Path: Horizontal, Vertical Up & Down, CZPT Course
11.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Input Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Potential Selection: .37kW ~ 11kW

two. CZPT parameters

Kind Old Type Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould company, was recognized in 1965. CZPTshine specializes in the total electrical power transmission remedy for high-finish tools producing industries based on the intention of “Platform Solution, Application Style and Specialist Provider”.
CZPTshine have a sturdy technological power with above 350 workers at present, such as above 30 engineering professionals, 30 top quality inspectors, covering an spot of 80000 square meters and varieties of CZPTd processing devices and screening equipments. We have a excellent basis for the business software growth and service of higher-end pace reducers & variators proudly owning to the provincial engineering technology investigation centre,the lab of equipment velocity reducers, and the base of contemporary R&D.

Our Group

Good quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.

Packing

Delivery

 

Suit Impact and Loading Situations Cycloidal CZPT with Flange Input Types