S collection CZPTcal Geared Motor Attributes
one. Attributes:
- High efficiency: seventy five%-80%
- Substantial technology: the helical gear and a worm equipment merged with an integrated transmission to improve the torque and effectiveness.
- Higher precision: the equipment is created of higher-good quality alloy steel forging, carbonitriding and hardening treatment, grinding process to make certain higher precision and steady operating.
- High interchangeability: highly modular, serial design, sturdy versatility and interchangeability.
two. CZPT parameters
Ratio |
six.eight-288 |
Input power |
.12-22KW |
Output torque |
eleven-4530N.m |
Output pace |
five-206rpm |
Mounting sort |
Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Method |
Flange input(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
Brake Release |
HF-handbook release(lock in the brake launch position), HR-manual release(autom-atic braking position) |
Thermistor |
TF(Thermistor safety PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Placement |
M1, M2, M3, M4, M5, M6 |
Variety |
S37-S97 |
Output shaft dis. |
20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material |
HT200 large-energy forged iron from R37,47,57,67,77,87 |
Housing materials |
HT250 Large strength cast iron from R97 107,137,147, 157,167,187 |
Heat treatment technology |
carbonitriding and hardening therapy |
Solitary Phase Performance |
75%-eighty% |
Lubricant |
VG220 |
Protection Class |
IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould enterprise, was established in 1965. CZPTshine specializes in the comprehensive energy transmission remedy for higher-stop products producing industries dependent on the intention of “Platform Solution, Application Design and Specialist Support”.
CZPTshine have a robust complex force with more than 350 workers at existing, such as over thirty engineering professionals, thirty high quality inspectors, masking an location of 80000 sq. meters and varieties of CZPTd processing devices and tests equipments. We have a very good foundation for the market application advancement and service of higher-stop pace reducers & variators possessing to the provincial engineering technologies research middle,the lab of gear speed reducers, and the base of present day R&D.
Our Team
Quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping and delivery