S collection CZPTcal Geared Motor Characteristics
one. Functions:
- Higher performance: seventy five%-eighty%
- Higher technologies: the helical gear and a worm equipment merged with an built-in transmission to improve the torque and effectiveness.
- High precision: the gear is produced of large-quality alloy steel forging, carbonitriding and hardening remedy, grinding approach to guarantee high precision and secure working.
- Substantial interchangeability: hugely modular, serial design, strong versatility and interchangeability.
2. CZPT parameters
Ratio | 6.eight-288 |
Input energy | .twelve-22KW |
Output torque | eleven-4530N.m |
Output speed | 5-206rpm |
Mounting variety | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Technique | Flange enter(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor |
Brake Release | HF-guide launch(lock in the brake launch placement), HR-handbook launch(autom-atic braking situation) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor security Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Sort | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material | HT200 large-strength forged iron from R37,forty seven,57,67,seventy seven,87 |
Housing content | HT250 Substantial energy solid iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
Single Phase Effectiveness | seventy five%-eighty% |
Lubricant | VG220 |
Security Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould company, was set up in 1965. CZPTshine specializes in the complete electricity transmission solution for large-end gear producing industries dependent on the intention of “System Solution, Software Style and Professional Services”.
CZPTshine have a strong complex drive with above 350 workers at current, including above thirty engineering experts, 30 quality inspectors, masking an spot of 80000 square meters and varieties of CZPTd processing devices and testing equipments. We have a great foundation for the sector application growth and provider of large-conclude pace reducers & variators owning to the provincial engineering engineering investigation center,the lab of equipment pace reducers, and the foundation of modern day R&D.
Our Team
Top quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
seven. Certification.
Packing
Supply