JWB Sequence Velocity Variator
one. Functions:
JWB-X type
- Sizes: ≥04
- Power up to 1.5 kW or a lot more
- Situations in RAL 5571 blue solid iron
- Shafts: scenario hardened and tempered steel.
- Inside factors: heat-handled steel
- Output speed with 4 pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque benefit max 1002Nm
- CZPT, vibration-totally free operating
- Bidirectional rotation
- Handle handwheel positionable on both side
- Slipping pace to max load at 5%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
JWB-X B type
- Dimensions:01,02,03 and 04
- Electricity up to 1.5 kW or much less
- Circumstances in die-solid aluminium alloy
- Shafts: scenario hardened and tempered metal.
- Inside parts: warmth-treated metal
- Output pace with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, eight-40r/min, nine-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque worth max 795 Nm
- CZPT, vibration-free of charge operating
- Bidirectional rotation
- Management hand wheel positionable on either aspect
- Slipping velocity to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
2. CZPT parameters
Type | Output Torque | Output Shaft Dia. | Output Speed Variety | 2rpm-950rpm | |
SWB01 | two.six-one.6N.m | φ11 | Relevant Motor Power | .18kW-seven.5kW | |
SWB02 | 258-one.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Possibilities | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Input Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned navy mould enterprise, was established in 1965. CZPTshine specializes in the total electrical power transmission answer for large-stop gear production industries primarily based on the aim of “Platform Item, Software Layout and Specialist Service”.
CZPTshine have a powerful specialized drive with above 350 personnel at current, such as more than 30 engineering specialists, 30 quality inspectors, covering an region of 80000 square meters and sorts of CZPTd processing machines and screening equipments. We have a great foundation for the sector software advancement and provider of substantial-finish velocity reducers & variators possessing to the provincial engineering technological innovation analysis center,the lab of gear pace reducers, and the base of modern day R&D.
Our Team
Good quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
Packing
Supply