JWB Sequence Pace Variator
1. Characteristics:
JWB-X type
- Measurements: ≥04
- Power up to 1.5 kW or a lot more
- Instances in RAL 5571 blue solid iron
- Shafts: case hardened and tempered steel.
- Interior parts: warmth-dealt with steel
- Output speed with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque benefit max 1002Nm
- CZPT, vibration-totally free managing
- Bidirectional rotation
- Control handwheel positionable on either aspect
- Slipping speed to max load at 5%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
JWB-X B type
- Measurements:01,02,03 and 04
- Electricity up to 1.5 kW or much less
- Situations in die-forged aluminium alloy
- Shafts: case hardened and tempered metal.
- Inner elements: warmth-treated steel
- Output speed with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque benefit max 795 Nm
- CZPT, vibration-free working
- Bidirectional rotation
- Manage hand wheel positionable on both facet
- Slipping speed to max load at five%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
two. CZPT parameters
Variety | Output Torque | Output Shaft Dia. | Output Speed Variety | 2rpm-950rpm | |
SWB01 | two.6-1.6N.m | φ11 | Applicable Motor Electricity | .18kW-7.5kW | |
SWB02 | 258-1.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Alternatives | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Input Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould company, was proven in 1965. CZPTshine specializes in the complete energy transmission remedy for high-stop tools manufacturing industries based mostly on the aim of “Platform Solution, Software Design and style and Professional Services”.
CZPTshine have a strong complex drive with above 350 staff at current, including above thirty engineering specialists, 30 top quality inspectors, covering an location of 80000 square meters and kinds of CZPTd processing equipment and screening equipments. We have a great basis for the sector software growth and support of higher-end velocity reducers & variators proudly owning to the provincial engineering engineering analysis heart,the lab of equipment speed reducers, and the foundation of modern R&D.
Our Team
Quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping and delivery