with Motor Direct Input Types Cycloidal Gearbox for Impact and Loading Situations

with Motor Direct Input Types Cycloidal CZPT for Impact and Loading Situations

CZPTshine CZPT Cycloid Geared Motor Qualities

one. Functions:
one. Smooth running,lower sound equipment tooth needle more engagement.
2. Cycloidal tooth profile offers a high get in touch with ratio to withstand overload shocks
3. Compact measurement: single ratio CZPT from one/9 to 1/87, double phase up from 1/99 to one/7569 
four. Excellent for dynamic apps: repeated start off-quit-reversing obligations fits for cyclo pace reducer considering that inertia is minimal
5. Lessen upkeep costs: higher trustworthiness, lengthy existence, nominal upkeep in comparison to typical gearboxes
6. Internal components replaceable with other makes to make certain operating.

7. Grease Lubricated & Oil Lubricated Types Available
eight. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Situations: Indoor Set up:10-forty Celsius, Max eighty five% Humidity, Under 1000m Altitude, Nicely Ventilated Setting, Cost-free of corrosive,        explosive gases, vapors and dust
ten.Gradual Velocity Shaft Course: Horizontal, Vertical Up & Down, CZPT Course
eleven.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Connection: Cyclo Integral Motor, Hollow Input Shaft Adapter
thirteen. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capability Variety: .37kW ~ 11kW

two. CZPT parameters

Kind Aged Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould business, was established in 1965. CZPTshine specializes in the full energy transmission remedy for high-finish gear producing industries dependent on the goal of “Platform Solution, Application Style and Specialist Support”.
CZPTshine have a sturdy complex drive with in excess of 350 staff at present, such as over 30 engineering technicians, 30 good quality inspectors, covering an spot of 80000 sq. meters and varieties of CZPTd processing devices and tests equipments. We have a great basis for the industry application development and support of substantial-stop speed reducers & variators possessing to the provincial engineering technological innovation analysis center,the lab of gear pace reducers, and the base of modern day R&D.

Our Staff

High quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

with Motor Direct Input Types Cycloidal CZPT for Impact and Loading Situations