with Motor Direct Input Types Cycloidal Gearbox with Planetary Drive for Against Shock

with Motor Direct Input Types Cycloidal CZPT with Planetary CZPT for Against Shock

CZPTshine CZPT Cycloid Geared Motor Attributes

one. Attributes:
1. Smooth running,low noise gear tooth needle much more engagement.
2. Cycloidal tooth profile offers a substantial contact ratio to endure overload shocks
3. Compact dimensions: single ratio CZPT from one/9 to 1/87, double stage up from 1/99 to 1/7569 
four. Best for dynamic applications: frequent start off-quit-reversing duties fits for cyclo speed reducer given that inertia is low
5. Lessen upkeep fees: large dependability, long daily life, small servicing when compared to typical gearboxes
six. Internal areas replaceable with other brand names to guarantee operating.

seven. Grease Lubricated & Oil Lubricated Versions Accessible
eight. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Circumstances: Indoor Set up:10-40 Celsius, Max eighty five% Humidity, Below 1000m Altitude, Properly Ventilated Atmosphere, Free of corrosive,        explosive gases, vapors and dust
ten.Sluggish Velocity Shaft Course: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capacity Variety: .37kW ~ 11kW

2. CZPT parameters

Kind Aged Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould company, was recognized in 1965. CZPTshine specializes in the total electricity transmission answer for large-conclude tools production industries based mostly on the aim of “System Solution, Software Layout and Specialist Services”.
CZPTshine have a powerful specialized pressure with over 350 personnel at current, which includes more than thirty engineering experts, thirty high quality inspectors, masking an spot of 80000 square meters and kinds of CZPTd processing machines and screening equipments. We have a very good foundation for the market application improvement and support of large-finish velocity reducers & variators possessing to the provincial engineering technology analysis center,the lab of gear pace reducers, and the foundation of modern R&D.

Our Crew

Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

 

with Motor Direct Input Types Cycloidal CZPT with Planetary CZPT for Against Shock