S series CZPTcal Geared Motor Traits
one. Attributes:
- Higher efficiency: seventy five%-80%
- High technological innovation: the helical equipment and a worm gear mixed with an integrated transmission to improve the torque and efficiency.
- High precision: the equipment is manufactured of higher-quality alloy metal forging, carbonitriding and hardening treatment method, grinding procedure to guarantee substantial precision and steady managing.
- Large interchangeability: hugely modular, serial design and style, sturdy flexibility and interchangeability.
2. CZPT parameters
Ratio | six.8-288 |
Enter electrical power | .12-22KW |
Output torque | 11-4530N.m |
Output velocity | 5-206rpm |
Mounting type | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Method | Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor |
Brake Release | HF-manual release(lock in the brake launch situation), HR-handbook release(autom-atic braking place) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Kind | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material | HT200 large-energy cast iron from R37,47,fifty seven,sixty seven,seventy seven,87 |
Housing content | HT250 Substantial energy solid iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment |
Single Stage Performance | 75%-eighty% |
Lubricant | VG220 |
Security Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned navy mould company, was established in 1965. CZPTshine specializes in the complete electrical power transmission solution for high-stop equipment manufacturing industries dependent on the aim of “Platform Merchandise, Application Design and Skilled Support”.
CZPTshine have a powerful technological force with over 350 personnel at present, such as in excess of thirty engineering technicians, 30 top quality inspectors, masking an area of 80000 sq. meters and varieties of CZPTd processing machines and screening equipments. We have a very good foundation for the market software advancement and service of large-end pace reducers & variators owning to the provincial engineering technology research heart,the lab of gear speed reducers, and the base of contemporary R&D.
Our Team
High quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping