Worm Gearbox Manufacturer

Worm CZPT Manufacturer

RV sequence Characteristics

  • RV – Sizes:030-040-050-063-075-a hundred and five-a hundred and ten-a hundred thirty-a hundred and fifty
  • Input Possibilities: with input shaft, With Sq. flange,With Enter Flange
  • Enter Power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-cast aluminium alloy budy and above one hundred ten in cast iron
  • Ratios in between 5 and 100
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium units are provided comprehensive with artificial oil and let for universal mounting positions, with no want to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, lower/substantial temperature oil, filling/drain/breather/level plug,Modest hole

Simple types can be applied to a vast selection of electrical power reduction ratios from 5 to 1000.
Warranty: One year from day of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Assortment:
Kind Previous Type Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned navy mould organization, was proven in 1965. CZPTshine specializes in the total energy transmission answer for higher-conclude gear manufacturing industries dependent on the aim of “System Merchandise, Software Layout and Professional Support”.
CZPTshine have a robust technological pressure with above 350 personnel at existing, like over thirty engineering experts, thirty quality inspectors, masking an region of 80000 sq. meters and sorts of CZPTd processing equipment and tests equipments. We have a excellent foundation for the business application improvement and support of higher-end speed reducers & variators proudly owning to the provincial engineering technological innovation analysis middle,the lab of gear velocity reducers, and the foundation of present day R&D.

Our Crew

Quality Handle
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

Worm CZPT Manufacturer