Chinese Factory Mechanical Power Transmission Helical Gearbox

Chinese Factory CZPT Power Transmission Helical CZPT

R series CZPTcal Geared Motor Traits

one. Functions:

1. High effectiveness: 92%-97%

 

two. Compact construction: Little offset output, two stage and three stage are in the same box.

 

three. High precision: the gear is created of large-top quality alloy steel forging, carbonitriding and hardening treatment method, grinding procedure to ensure higher precision and secure running.

4. High interchangeability: highly modular, serial layout, strong versatility and interchangeability.

2. CZPT parameters

Ratio 3.forty one-289.seventy four
Input electrical power .12-160KW
Output torque 61-23200N.m
Output pace five-415rpm
Mounting sort Foot mounted, flange mounted, foot and flange mounted, single-stage foot mounted, single stage flange mounted, Flange-mounted with prolonged bearing hub
Input Strategy Flange enter(AM), shaft enter(Advert), inline AC motor input, or AQA servo motor
Brake Launch HF-guide release(lock in the brake release situation), HR-manual release(autom-atic braking position)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor protection Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Sort R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing substance HT200 high-power cast iron from R37,forty seven,57,sixty seven,seventy seven,87
Housing substance HT250 Higher toughness forged iron from R97 107,137,147,157,167,187
Warmth treatment technology carbonitriding and hardening treatment method
Effectiveness ninety two%-ninety seven%
Lubricant VG220
Safety Class IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was proven in 1965. CZPTshine specializes in the total energy transmission remedy for high-stop equipment production industries primarily based on the aim of “System Solution, Software Design and style and Specialist Services”.
CZPTshine have a strong technical force with over 350 employees at present, which includes above 30 engineering professionals, thirty quality inspectors, covering an area of 80000 sq. meters and types of CZPTd processing equipment and screening equipments. We have a very good foundation for the business software advancement and service of substantial-finish velocity reducers & variators owning to the provincial engineering technological innovation study heart,the lab of gear pace reducers, and the base of modern day R&D.

Our Crew

Quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

Chinese Factory CZPT Power Transmission Helical CZPT