F collection Parallel Shaft-CZPTcal Geared Motor Traits
1.Attributes:
- Large effectiveness: ninety two%-94%
- Parallel output, compact structure, massive output torque, smooth procedure, lower noise and long service life.
- Higher precision: the equipment is made of large-high quality alloy steel forging, carbonitriding and hardening treatment, grinding approach to make certain high precision and stable operating.
- Large interchangeability: very modular, serial layout, strong versatility and interchangeability.
two. CZPT parameters
Ratio | three.77-276.seventy seven |
Input electricity | .twelve-200KW |
Output torque | 3.5-21700N.m |
Output velocity | 5-352rpm |
Mounting kind | Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Strategy | Flange input(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-manual release(lock in the brake release place), HR-manual launch(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Kind | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing substance | HT200 high-strength solid iron from R37,47,fifty seven,sixty seven,seventy seven,87 |
Housing content | HT250 Large strength cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening therapy |
Efficiency | 92%-94% |
Lubricant | VG220 |
Security Class | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was set up in 1965. CZPTshine specializes in the full energy transmission remedy for substantial-end tools production industries based on the purpose of “System Solution, Application Design and Expert Services”.
CZPTshine have a robust specialized drive with above 350 staff at present, like in excess of 30 engineering specialists, 30 quality inspectors, covering an location of 80000 sq. meters and sorts of CZPTd processing devices and screening equipments. We have a great foundation for the market software improvement and support of substantial-finish speed reducers & variators possessing to the provincial engineering technologies analysis heart,the lab of gear pace reducers, and the base of present day R&D.
Our Group
Top quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
7. Certification.
All our merchandise get ISO & CE & UL certification.
Packing
Delivery