K sequence Parallel Shaft-CZPTcal Geared Motor Characteristics
1. Attributes:
- Large performance: ninety two%-ninety three%
- Vertical output, compact structure, difficult tooth floor , massive output torque, lower noise and long provider daily life.
- Large precision: the equipment is made of large-quality alloy steel forging, carbonitriding and hardening treatment method, grinding process to make sure high precision and secure running.
- Higher interchangeability: highly modular, serial style, robust versatility and interchangeability.
2. CZPT parameters
Ratio | five.36-197.37 |
Input electricity | .12-200KW |
Output torque | ten-62800N.m |
Output speed | 7-415rpm |
Mounting variety | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Approach | Flange input(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor |
Brake Release | HF-guide launch(lock in the brake launch place), HR-handbook release(autom-atic braking situation) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Variety | K37-K157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing content | HT200 higher-toughness cast iron from R37,forty seven,57,67,77,87 |
Housing content | HT250 High power solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
One Stage Effectiveness | up to ninety six% |
Lubricant | VG220 |
Protection Course | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was recognized in 1965. CZPTshine specializes in the complete power transmission solution for substantial-conclude tools manufacturing industries based on the aim of “System Merchandise, Software Design and Skilled Provider”.
CZPTshine have a robust specialized force with in excess of 350 employees at current, which includes over 30 engineering professionals, 30 top quality inspectors, masking an region of 80000 square meters and sorts of CZPTd processing devices and testing equipments. We have a excellent basis for the industry software improvement and support of high-conclude velocity reducers & variators owning to the provincial engineering technologies investigation middle,the lab of gear velocity reducers, and the base of present day R&D.
Our Team
Top quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
All our goods get ISO & CE & UL certification.
Packing
Shipping and delivery