K collection Parallel Shaft-CZPTcal Geared Motor Qualities
1. Characteristics:
- Higher performance: ninety two%-93%
- Vertical output, compact framework, tough tooth area , massive output torque, reduced noise and long support existence.
- Substantial precision: the equipment is created of substantial-good quality alloy steel forging, carbonitriding and hardening treatment, grinding process to make sure substantial precision and secure working.
- Higher interchangeability: highly modular, serial design and style, sturdy flexibility and interchangeability.
two. CZPT parameters
Ratio | 5.36-197.37 |
Input electricity | .twelve-200KW |
Output torque | ten-62800N.m |
Output speed | seven-415rpm |
Mounting variety | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Technique | Flange input(AM), shaft input(Ad), inline AC motor input, or AQA servo motor |
Brake Release | HF-handbook launch(lock in the brake release situation), HR-manual release(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Sort | K37-K157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 higher-energy forged iron from R37,forty seven,fifty seven,67,seventy seven,87 |
Housing material | HT250 Large toughness cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening remedy |
Single Stage Effectiveness | up to ninety six% |
Lubricant | VG220 |
Protection Course | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould organization, was set up in 1965. CZPTshine specializes in the comprehensive power transmission answer for substantial-finish equipment producing industries based mostly on the intention of “Platform Merchandise, Software Layout and Skilled Provider”.
CZPTshine have a powerful specialized pressure with above 350 employees at present, such as in excess of 30 engineering professionals, 30 top quality inspectors, masking an area of 80000 sq. meters and types of CZPTd processing devices and tests equipments. We have a excellent basis for the sector application improvement and support of large-conclude pace reducers & variators proudly owning to the provincial engineering technological innovation analysis centre,the lab of gear velocity reducers, and the foundation of modern day R&D.
Our Group
Good quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
All our products get ISO & CE & UL certification.
Packing
Shipping