R series CZPTcal Geared Motor Qualities
1. Characteristics:
1. High efficiency: ninety two%-97%
2. Compact structure: Small offset output, two stage and three stage are in the same box.
three. High precision: the gear is manufactured of higher-quality alloy steel forging, carbonitriding and hardening remedy, grinding procedure to ensure higher precision and stable operating.
four. High interchangeability: highly modular, serial design and style, sturdy versatility and interchangeability.
2. CZPT parameters
Ratio | 3.41-289.74 |
Enter electrical power | .twelve-160KW |
Output torque | sixty one-23200N.m |
Output speed | 5-415rpm |
Mounting sort | Foot mounted, flange mounted, foot and flange mounted, solitary-phase foot mounted, one stage flange mounted, Flange-mounted with prolonged bearing hub |
Enter Technique | Flange input(AM), shaft input(Advertisement), inline AC motor input, or AQA servo motor |
Brake Launch | HF-handbook launch(lock in the brake release placement), HR-handbook release(autom-atic braking placement) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Sort | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing substance | HT200 high-energy forged iron from R37,forty seven,57,sixty seven,77,87 |
Housing material | HT250 Higher energy cast iron from R97 107,137,147,157,167,187 |
Warmth treatment technology | carbonitriding and hardening remedy |
Effectiveness | 92%-97% |
Lubricant | VG220 |
Safety Course | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould enterprise, was proven in 1965. CZPTshine specializes in the comprehensive energy transmission resolution for high-conclude tools production industries dependent on the goal of “Platform Merchandise, Application Design and style and Expert Support”.
CZPTshine have a strong technological power with above 350 personnel at existing, such as above 30 engineering experts, thirty quality inspectors, covering an spot of 80000 square meters and sorts of CZPTd processing machines and screening equipments. We have a good basis for the sector software advancement and provider of large-conclude speed reducers & variators proudly owning to the provincial engineering engineering investigation heart,the lab of gear velocity reducers, and the base of modern R&D.
Our Crew
Quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
7. Certification.
Packing
Supply