S collection CZPTcal Geared Motor Characteristics
1. Functions:
- Higher effectiveness: seventy five%-eighty%
- Higher technologies: the helical gear and a worm equipment mixed with an built-in transmission to increase the torque and efficiency.
- Higher precision: the gear is manufactured of higher-quality alloy steel forging, carbonitriding and hardening treatment method, grinding method to make certain substantial precision and secure managing.
- Large interchangeability: hugely modular, serial design and style, sturdy flexibility and interchangeability.
two. CZPT parameters
Ratio | 6.8-288 |
Input power | .twelve-22KW |
Output torque | 11-4530N.m |
Output speed | five-206rpm |
Mounting kind | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Method | Flange enter(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor |
Brake Release | HF-guide launch(lock in the brake release placement), HR-manual release(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Variety | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material | HT200 high-strength forged iron from R37,47,57,sixty seven,77,87 |
Housing material | HT250 Higher power cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
One Phase Performance | 75%-80% |
Lubricant | VG220 |
Safety Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould company, was proven in 1965. CZPTshine specializes in the full electrical power transmission answer for high-conclude products production industries based on the goal of “System Solution, Application Design and Expert Support”.
CZPTshine have a powerful technical power with in excess of 350 workers at existing, including above thirty engineering experts, thirty top quality inspectors, covering an location of 80000 square meters and sorts of CZPTd processing devices and testing equipments. We have a very good foundation for the industry application growth and provider of substantial-end velocity reducers & variators possessing to the provincial engineering technological innovation analysis center,the lab of gear speed reducers, and the foundation of modern day R&D.
Our Group
Top quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping